# Only released material reaches the weighing room. *Every step on record.*

ERPNext runs purchasing, stock and production well. A GMP site needs more: a release status on every batch, qualified suppliers, potency-adjusted quantities, controlled dispensing and signed approvals. This product adds those controls inside ERPNext, so the batch record lives where the stock does.

Covers Supplier qualification Quarantine and release Assay adjustment Dispensing and weighing Audited labels E-signatures

[Book a demo](https://quarkcs.com/contact?interest=product) What ERPNext does not include

The problem

## Standard ERP stock is usable *the moment it arrives.*

In a GMP plant, received material is on hold until QC releases it, and only an approved source may be bought at all. Without those rules in the system, they live on paper, in spreadsheets and in people's memory.

GMP rules kept outside the ERP

- Quarantine is a sticker on the drum; the system can still issue the stock
- The approved supplier list is a spreadsheet, checked by hand before ordering
- API quantities are recalculated for potency on a calculator, then typed in
- Weighing is recorded on a paper sheet and keyed into the ERP afterwards
- Labels are printed from a separate tool, with no record of reprints

GMP rules enforced in ERPNext

- Every batch carries a status in the stock ledger; only Released stock can be consumed
- A purchase order is refused unless the supplier is approved for that item and manufacturer
- The work order adjusts the API for the batch's assay, and the excipient balances it
- Weighing posts the stock movement itself, inside the material's tolerance
- Every label is a numbered record; a reprint needs a reason and replaces the old one

Beyond standard ERPNext

## What this adds that ERPNext *does not include.*

ERPNext already provides batches with expiry dates, BOMs, work orders, pick lists, quality inspections and configurable workflows. These are the GMP controls built on top of them.

GMP need Standard ERPNext With this product

Quarantine and release A quality inspection can accept or reject a receipt, but received stock is available to use straight away **Status on every batch in the ledger**: Quarantine, Released, Conditional Released, Blocked, Rejected. Consumption takes only Released stock

Who may release what No status transitions to control **Transition rules by item group and role**: QC or QP for raw materials, QP only for finished product

Approved suppliers Supplier and item records; nothing stops an order to an unqualified source **Qualification per supplier, item and manufacturer**, with certificates, validity and blocking. Orders and receipts are checked against it

Multi-site supply chains One manufacturer per item record **Manufacturer chains**: intermediate maker, final manufacturer and test lab, each with its own audit and quality status

Potency adjustment Required quantities follow the BOM **Assay-based factorisation**: the API is scaled by the lot's assay and a nominated excipient absorbs the difference

BOM approval A BOM is submitted, then used **Draft, RA review, QP review, Released**. A released BOM is locked; changes need a new version

Dispensing Material transfers and job cards **Dispensing queue and weighing station**: staging and weighing-room reservations, weighing within tolerance, leftovers returned

Controlled substances No second-person check **Narcotic materials need a second operator's e-signature** at the weighing station

Labels Print formats, with no record of what was printed **A label ledger**: numbered containers, QR codes, reprints with a reason, labels cancelled with their document

Electronic signatures Document versions, no signing step **Password re-entry at release**, written to a signature log with user, time and record

One batch, end to end

## From approved supplier *to released product.*

The same sequence runs for every batch, and each step leaves its own record.

1. 01

   ### Qualify

   Supplier approved for the item and its manufacturer or manufacturer chain, with certificates and validity.
2. 02

   ### Receive

   Purchase order checked against the approved list. Goods arrive in Quarantine with lot, dates and assay, and every container gets a label.
3. 03

   ### Release

   QC moves the batch to Released with a signed status change. The release label prints automatically.
4. 04

   ### Approve the BOM

   RA and QP review, then Released. Only a released BOM can be used on a work order.
5. 05

   ### Plan the batch

   The work order picks released lots and adjusts quantities for assay. Release creates the product batch.
6. 06

   ### Dispense

   Staging, weighing room, weigh within tolerance, return the leftover. Each weigh posts the stock movement and prints its label.
7. 07

   ### Manufacture

   One final entry consumes exactly what was weighed, records the yield, and puts the product in Quarantine.
8. 08

   ### Certify

   QP moves the finished batch from Quarantine to Released, and its release label prints.

Quarantine and release

## Status is part of the stock, *not a note about it.*

Every quantity in the ledger carries its status, so the balance report shows exactly what is on hold, released or blocked, per batch and per warehouse.

**Inventory Status Balance.** One excipient lot is still in Quarantine; everything else on hand has been released. Released and quarantined quantities of the same batch are kept apart in every warehouse.

**A signed release.** 60 kg moved from Quarantine to Released in Stores. The change posts its own stock entry and prints the batch release labels.

**Who may release what.** Rules per item group and role. A weighing operator who tries to release a lot is refused and told which roles may do it.

Supplier qualification

## An unapproved source *cannot be ordered.*

Qualification is held per supplier, item and manufacturer. When a source is blocked, the purchase order is refused at save, with a link to the record that blocks it.

**Refused at the purchase order.** The supplier's qualification for magnesium stearate was blocked after a failed audit, so the order cannot be saved.

**Manufacturer chains.** One source, three sites: intermediate, final manufacture and release testing. Each site's quality status and audit date update from its own record.

Assay adjustment

## The API is dosed by potency, *not by weight on the BOM.*

When the selected API lot assays below 100%, the work order raises its quantity so the batch contains the intended amount of active ingredient. A nominated excipient is reduced by the same amount, so the batch weight stays on target.

- Factorising is set per BOM line, and at most one excipient balances the batch
- A factorised line needs a batch, and an API batch needs an assay, before the work order can be released
- Non-factorised lines stay locked to the BOM total, even when split across several lots

Work order · 100 kg batch **API lot at 98.5% assay**

1. **Paracetamol (API): 50.000 → 50.761 kg** 50 × 100 ÷ 98.5
2. **Microcrystalline cellulose: 45.000 → 44.239 kg** Absorbs the 0.761 kg difference
3. **Magnesium stearate: 5.000 kg** Not factorised, locked to the BOM

Batch weight stays at 100 kg. The figures come from the demo run shown below.

**The work order.** Factorising lines marked, BOM quantity next to the adjusted requirement, and the planned lot on each line.

Dispensing and weighing

## One queue for the weighing room. *No job cards to chase.*

The dispensing queue shows every released work order and where each of its materials is: in stores, in staging or in the weighing room. Material moved for one order is reserved for it, so another order cannot take it.

Stores

**Released lots** Picked first-expiry-first-out, planned lot first

Weighing staging

**Reserved for the order** Pick list transfer

Weighing room

Scan Weigh Within tolerance Label

Work in progress

**Issued to the order** Leftover returns to staging

Each move is a stock entry that carries the batch's release status. Stock that is not Released cannot be issued to a work order.

**Dispensing queue.** The API is in the weighing room; the two excipients are staged and reserved for this order. Each line shows its batch and weighing tolerance.

**Weighing station.** Target 50.761 kg, accepted range ±1%, capped at what is in the room. Accept Weight only enables inside the range, and posts the transfer to production. The reading here was entered for the demo; on site it comes from the connected scale.

Labels

## Every label is a record, *not just a printout.*

Receipt, release, weighing, intermediate, sample and shipping labels are each numbered and logged. A QR code identifies the container or batch, and dispensing can check it.

Numbered

### Container 2 of 3.

Each container gets its own label and sequence, and the last one can be marked as the partial rest container.

Controlled

### Reprints need a reason.

A reprint replaces the active set and records why. Cancelling the receipt or work order cancels its labels too.

Your layout

### Your label designs.

Layouts are print formats, so each site keeps its own label design, language and fields.

**Label print ledger.** Receipt crate and batch release labels per lot, with each container's sequence number.

Data integrity

## Signed, locked and traceable.

- Release steps ask for the user's password again and write a signature log entry
- At the weighing station, narcotic materials need a second operator with the approver role to sign first
- A released BOM cannot be edited; batch dates change only through a status change with a reason
- Qualifications past their validity are expired automatically, and retest-due batches return to Quarantine
- Every document keeps ERPNext's full version history: who changed what, and when

For the QA team

## The day's GMP work on one screen.

The GMP Compliance workspace opens on what needs attention: open work orders, batches waiting for release, lots close to expiry or retest, suppliers waiting for approval and signatures captured.

Screens from the product running on ERPNext v16 with demo data: company, suppliers, manufacturers and batches are fictional.

## Bring us one product and its BOM. We will run a batch through release, dispensing and certification with you.

[Book a demo](https://quarkcs.com/contact?interest=product) [All products](https://quarkcs.com/products)